ZeroGrid LogoZeroGrid
_legal terms & service agreement

ZeroGrid Terms of Service

Clear, transparent terms governing high-efficiency heat pump installations, air purification systems, model-specific warranties, and electrification rebates.

Effective: January 1, 2026Last Updated: October 7, 2026v2.4

Key Highlights At A Glance

Plain English Summary

Equipment & Installation Warranty Terms

Equipment and installation coverage depends on the manufacturer terms, registration requirements, and signed project agreement.

Turnkey Permitting & Engineering

ZeroGrid handles municipal mechanical permits, ACCA Manual J thermal load blueprints, and utility rebate filings.

Milestone-Based Billing

Progressive payments tied strictly to verified milestones: engineering approval, physical installation, and final inspection.

Statutory Rescission Rights

Full statutory right to cancel within three business days of contract execution with zero penalty or restocking fees.

01
Section 01

Agreement to Terms & Binding Contract

These Terms of Service ("Terms") constitute a legally binding agreement between you ("Customer," "Property Owner," or "you") and Zerogrid LLC ("ZeroGrid," "we," "our," or "us"). These Terms govern your access to our website, digital customer portals, mobile applications, and your engagement with our HVAC engineering, procurement, installation, and indoor air quality services (collectively, the "Services").

When you execute a specific ZeroGrid HVAC Installation Agreement & Work Order, the provisions of that signed project agreement shall govern in conjunction with these general Terms. In the event of any direct conflict between these Terms and your executed project agreement, the executed agreement will take precedence.

Clarity & Consumer Protection: We believe in transparent HVAC agreements free from deceptive sales gimmicks, hidden change orders, or opaque fine print. Every phase of your heating, cooling, or air filtration project is clearly demarcated before any physical work begins.
02
Section 02

Eligibility, Property Ownership & Site Readiness

To contract for ZeroGrid heat pump and indoor air solutions, you represent and warrant that:

  • Legal Age & Capacity: You are at least 18 years of age and possess the legal power to enter into binding contractual commitments;
  • Title & Authority: You are the lawful fee-simple owner of the property designated for installation, or possess formal, notarized written authorization from the property owner to approve mechanical and electrical modifications;
  • Condo & HOA Compliance: You agree to cooperate in submitting architectural or outdoor condenser placement notifications if required by your community bylaws or homeowner association covenants;
  • Safe Site Access: You agree to provide our licensed site assessors, mechanical engineers, and certified HVAC crews unencumbered, safe access to your property, basement/utility closet, attic spaces, service electrical panel, and outdoor condenser pad during scheduled business hours.
03
Section 03

Scope of Engineering & Installation Services

ZeroGrid delivers comprehensive, turnkey heat pump and indoor air solutions adhering to ACCA standards, National Electrical Code (NEC), and local mechanical ordinances:

ACCA Manual J Load Audit

Precise room-by-room heating and cooling thermal load calculations accounting for insulation, window glazing, ceiling heights, and regional climate extremes.

Electrical Dedicated Circuits

Installation of dedicated 240V breaker circuits, exterior weatherproof disconnect switches, surge suppressors, and main service upgrades if needed.

Ductwork & Airflow Balancing

Duct leakage mastic sealing, static pressure optimization, motorized zoning damper calibration, and room-by-room supply CFM balancing.

Refrigerant & IoT Commissioning

Triple vacuum evacuation below 500 microns, subcooling/superheat digital verification according to factory specifications, and smart thermostat telemetry pairing.

Unforeseen Site Conditions: In rare instances where demolition reveals structural framing dry rot, hazardous asbestos insulation around legacy pipes, or ungrounded wiring, ZeroGrid will present a formal Change Order detailing remediation options prior to performing further work.

04
Section 04

Mechanical Permitting & Municipal Inspections

As part of our turnkey commitment, ZeroGrid prepares and files all municipal mechanical permits, electrical permits, and required energy compliance certificates on your behalf:

  • Regulatory Timelines: While ZeroGrid submits applications expeditiously, processing timelines are determined solely by municipal building and safety departments;
  • Final Inspection Attendance: ZeroGrid schedules and coordinates the final municipal inspection with your local code official to ensure full sign-off and safety compliance;
  • Code Compliance Guarantee: All installations strictly satisfy modern International Mechanical Code (IMC), International Energy Conservation Code (IECC), and NEC standards.
Safety Notice: Refrigerant work requires appropriately qualified personnel. Follow equipment instructions and applicable refrigerant-handling rules; unauthorized modifications may affect warranty coverage.
05
Section 05

Electrification Rebates & Clean Energy Incentives

Energy efficiency returns depend on utility rate structures, seasonal degree days, and applicable utility incentive programs:

  • Utility Clean Heat Rebates: We file the technical AHRI efficiency documentation required to unlock local electric utility heat pump rebates;
  • Program Eligibility: Incentives depend on the customer, property, equipment, contractor participation, and installation date. Confirm eligibility with the utility program before committing to work; incentives are not guaranteed.
06
Section 06

Equipment Warranties & Installation Terms

ZeroGrid stands behind our installations with the applicable written warranty terms:

Coverage ComponentWarranty PeriodScope of Guarantee
Inverter Heat Pump CompressorModel-specificManufacturer coverage, exclusions, registration deadlines, and eligibility depend on the selected equipment
Functional Parts & Electronic BoardsPer written termsReplacement coverage for inverters, expansion valves, blowers, and sensors
Installation Workmanship & LaborPer written termsAny installation workmanship or labor coverage must be stated in the signed project agreement
Indoor Air Purification & ERV UnitsModel-specificManufacturer warranty on ERV heat exchanger cores, UV-C ballast electronics, and motor fans
Warranty Exclusions

Warranties do not apply to damages caused by: (a) unauthorized third-party modifications, improper non-certified refrigerant additions, or system tampering; (b) failure to perform basic routine filter cleanings; (c) deliberate physical damage, projectile impact, or pet urine corrosion on condenser fins; or (d) extraordinary Force Majeure events exceeding standard engineering building codes.

07
Section 07

Pricing, Payment Milestones & Financing

Unless financed through an approved third-party electrification lender, HVAC installation contracts follow structured progress billing:

  • Milestone 1 — Engineering Deposit: Initial deposit upon contract signing to cover detailed Manual J calculations, equipment reservation, and municipal permit filings;
  • Milestone 2 — Equipment Delivery: Due upon heat pump and air handler arrival and staging at your property;
  • Milestone 3 — Substantial Installation: Due upon physical condenser mounting, line-set brazing, and ductwork connection;
  • Milestone 4 — Final Commissioning & Sign-off: Final retainage balance due upon system commissioning, airflow balancing, and municipal inspection sign-off.

For customers utilizing third-party clean energy loans, milestone disbursements are managed directly through your approved lending partner pursuant to your loan agreement.

08
Section 08

Cancellation Rights & 3-Day Cooling-Off Period

Under federal and state consumer protection standards, you have the statutory right to cancel your installation agreement without penalty within three (3) business days of contract execution ("Cooling-Off Period").

To exercise your right to cancel, you may transmit a signed cancellation notice via email to orders@zerogridhomes.com or mail written notice to our headquarters before midnight of the third business day.

If you cancel after the 3-day statutory window but prior to equipment delivery, you will receive a full refund minus actual out-of-pocket municipal permit fees and certified engineering calculation costs already incurred.

09
Section 09

Customer Obligations & Routine Maintenance

To ensure your heat pump and air purification systems operate at peak efficiency and preserve warranty coverage:

  • Air Filter Maintenance: You agree to inspect and replace return-air filters every 60 to 90 days (or rinse mini-split mesh filters monthly). Operating with clogged filters can damage inverter blowers;
  • Outdoor Clearance: Maintain at least 12 to 18 inches of clear space around the outdoor condenser, keeping vegetation, leaf piles, and snow accumulation clear from coil intake;
  • Thermostat Connectivity: Maintain home Wi-Fi connectivity for smart thermostats to enable diagnostic alerts and energy optimization.
10
Section 10

Limitation of Liability & Disclaimers

To the maximum extent permitted under applicable law:

  • No Consequential Damages: In no event shall ZeroGrid, its directors, officers, or certified technicians be liable for indirect, incidental, punitive, or consequential damages, including loss of anticipated energy savings, utility rate fluctuations, or third-party electrical service interruptions;
  • Aggregate Liability Cap: ZeroGrid's total aggregate liability arising out of or related to these Terms, the Services, or any executed installation agreement shall not exceed the total contract sum actually paid by Customer to ZeroGrid under the applicable installation agreement;
  • Thermal Performance Factors: Extreme historic weather anomalies exceeding 99% ASHRAE winter design temperatures (e.g., polar vortex events) may temporarily trigger supplemental heat stages as engineered.
11
Section 11

Dispute Resolution & Mandatory Arbitration

We strive to resolve any customer concerns amicably and swiftly. In the unlikely event of an unresolved dispute:

  • Informal Negotiation: Parties agree to engage in good-faith negotiations with a ZeroGrid executive for at least thirty (30) days prior to initiating formal legal proceedings;
  • Binding Arbitration: Any dispute, controversy, or claim arising out of or relating to this contract shall be resolved by binding arbitration administered by the American Arbitration Association (AAA) under its Consumer Arbitration Rules;
  • Class Action Waiver: All claims must be arbitrated on an individual basis. You agree that you shall not participate as a plaintiff or class member in any class, consolidated, or representative proceeding.
12
Section 12

Governing Law & General Provisions

These Terms are governed by and construed in accordance with the laws of the State in which the installation property is located, without giving effect to any principles of conflicts of law.

If any provision of these Terms is determined by an arbitrator or court of competent jurisdiction to be invalid or unenforceable, such provision shall be enforced to the maximum extent permissible, and the remaining provisions shall continue in full force and effect.

ZeroGrid reserves the right to modify these general Terms periodically. Updated versions will be published with a revised effective date.

Compliance & Legal Department

Have questions or need assistance?

Contact us with requests for project documents, privacy information, or clarification of your project terms.

Direct Email Contactlegal@zerogridhomes.com
Response Standard

Requests processed within 15 business days